Corporate offices, clinics and studio spaces designed for the working day — layout efficiency, acoustics, signage and a build that holds up under real daily use. Led directly by Archana Khannah.
The same five-stage process, adjusted for scale — led personally by Archana Khannah.
Headcount, department adjacency and compliance requirements mapped against the shell.
Two to three space plans tested for circulation, meeting-room ratio and future headcount.
Working drawings detailed enough that vendor quotes come back accurate, not approximate.
Multi-vendor coordination — civil, electrical, HVAC, carpentry — run to a published schedule.
A punch list walked room by room before your team moves in.
Most commercial interiors are designed for the org chart on the day of signoff, and start failing within eighteen months as teams grow or restructure. We build in flexibility at the workstation and meeting-room level specifically so a floor plan doesn't need a redesign every time HR does.
Archana Khannah personally runs commercial projects from layout through site supervision, which is unusual at this scale of firm — most agencies hand execution to a junior team once the design is approved. We don't.
Fire safety, HVAC load and building-management approvals are checked against the design before drawings are finalized, not discovered during fit-out — a step that avoids the most common cause of commercial project delays in India.
For a mid-size office (5,000–15,000 sq ft), design and execution typically runs 10–16 weeks depending on civil scope and approvals.
Yes — we coordinate directly with building management on approvals, working hours and shared-service access during fit-out.
Yes, we regularly plan fit-outs in phases to allow a team to occupy part of a floor while work continues on the rest.
We start every project with a site visit, before any design fee is discussed.